Friendship Public Charter School seeks qualified and experienced bidder(s) for. “Production Rigging Services to plan and execute rigging systems and support at the Washington Convention Center. Interested contractors must provide: Technical drawings and load bearing analysis, to specify identify what is required for the specific job and the provision of rigging equipment and riggers. Oversight of rigging plots, installation, point load verification, implementation of proper use and practices, pre-hang inspection of any suspended equipment, safe lifting practices, load out of equipment and post production management Ensure all aspects of the work plan adhere to current legislation, rigging equipment is regularly inspected to make sure it complies with the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER); when on site, company would ensure all rigging work meets the Construction Design & Management 2015 (CDM) Regulations, and rigging supervisors are certified to PLASA National Rigging Certificate (NRC) level 3, whilst all riggers hold NRC level 2, unless working as a trainee under supervision.”